Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

TORKEL860

BATTERY LOAD UNITS

  • Batteries can be tested “in service”
  • Unit adjusts to include load currents in the test parameters
  • User adjustable alarm and shutdown points to avoid excessive discharge
  • Easily expandable for larger battery banks using TXL extra load units (option)
  • Computerized test operation using TorkelWin software (option)

TORKEL 860 - MULTI is designed primarily for people who travel from place to place to maintain battery systems having different voltages. It features excellent discharging capacity plus a broad voltage range and outstanding portability - a unique combination.

 

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
Having all the monitoring systems and software installed on site is not enough when it comes to an emergency situation with your critical facility. Because once you know where the problem is and what needs to be done, you'd do well to have the needed spare parts at hand and quickly act to resolve the crisis. This is why we, at Vertiv, are here to make sure you will not have costly consequences, like loss of critical systems, revenue or customer trust, with complete spare parts and spare parts management service offering. Get in touch to find out more.

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
AW offers the reliable Standby storage energy sources using the most reliable battery chemistry according to the merit of the criticality. Nickel Cadmium batteries are the workhorses for the standby storage systems as they do not cause sudden death during their life time. Long life and reliable Gel & AGM type VRLA cells are provided by us with suitable Battery Monitoring Systems.

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
The 3-phase 80kVA Conex Trailer Mounted UPS system has the option for a 208VAC or 480VAC output and offers a wrap-around maintenance bypass. This trailer is equipped with 2 strings of VRLA monobloc batteries that should provide an estimated run time of 23 minutes at 64KW.

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
Advanced work offers Load bank testing provides information on a battery’s autonomy at the time of the test, as well as the integrity of all the electrical interconnections. The test is carried out when the uninterruptible power supply (UPS) is under load conditions to ensure the batteries are working optimally or to show whether any of the batteries are approaching the end of their working life or about to fail. The test is carried out with a device, the load bank, with our wide range of three phase, single phase, and DC load bank.  

Search